The Mats Hill Booster Pump Energy Saving Upgrade project began in April 2026 following MKE Engineering Group’s engineering review of Southern Water’s Booster Pumps 1, 2 and 3. 

The Project

The project was developed in partnership with Southern Water to modernise a critical pumping installation while retaining the existing pump assets, reducing energy consumption and improving long-term operational reliability. 

The project was undertaken for Southern Water, supporting the organisation’s commitment to improving the efficiency and sustainability of its water infrastructure. Rather than replacing the existing Sulzer split-case pumps, which remained mechanically sound, the project focused on upgrading the drive system around them to maximise performance while extending asset life.

The project was required because conventional induction motor technology was limiting the overall efficiency of the pumping system. Rising energy costs, increasing environmental expectations and the need to reduce whole-life operating costs created an opportunity to adopt ABB’s IE6 SynRM (Synchronous Reluctance Motor) technology. When combined with ABB variable speed drives, SynRM systems deliver significantly higher efficiency than traditional induction motors, particularly in variable speed pumping applications, while reducing heat losses, maintenance requirements and carbon emissions. The solution also avoided the financial and environmental cost of replacing pumps that remained hydraulically efficient by combining mechanical refurbishment, hydraulic improvements and high-efficiency motor technology.

The project aimed to deliver a complete energy optimisation package comprising pump overhaul, hydraulic efficiency improvements, installation of ABB IE6 SynRM motors, replacement ABB ACQ580 variable speed drives, and full mechanical, electrical and commissioning support. By integrating proven high-efficiency motor technology with refurbished pumping equipment, the project was designed to provide substantial reductions in energy consumption, improve operational performance, extend the service life of existing assets and create a more sustainable, lower-cost pumping solution for Southern Water for many years to come.

Project impact

The Mats Hill Booster Pump Energy Saving Upgrade has been designed to deliver long-term operational and financial benefits for Southern Water by significantly improving the efficiency of one of its critical pumping assets while avoiding the need for complete pump replacement. By retaining the existing Sulzer split-case pumps, which remained mechanically sound, and combining them with ABB IE6 SynRM motors, modern variable speed drives and hydraulic refurbishment, the project provides a cost-effective route to reducing energy consumption, improving reliability and extending asset life. This approach minimises disruption to operations while reducing ongoing maintenance requirements and whole-life operating costs.

From an environmental perspective, the project directly supports Southern Water’s sustainability objectives through reduced electrical energy demand and lower associated carbon emissions. ABB’s IE6 SynRM motor technology offers some of the highest efficiency levels currently available for industrial pumping applications, with significantly lower rotor losses than conventional induction motors. Coupled with variable speed control and hydraulic efficiency improvements, the upgraded system is expected to consume considerably less energy throughout its operational life, reducing the environmental impact of continuous pumping operations while extending the service life of existing equipment and reducing unnecessary material waste through asset reuse.

The wider consequences of the project extend beyond energy savings alone. The upgraded pumping system will provide improved operational performance, greater reliability and enhanced resilience for a critical water infrastructure asset. By modernising the drive systems and refurbishing the pumps rather than replacing the complete installation, Southern Water benefits from reduced operational risk, lower maintenance intervention, improved availability and a future-proofed solution that supports its long-term asset management strategy.

The project also demonstrates how existing infrastructure can be modernised to meet increasingly demanding efficiency and sustainability targets without extensive capital replacement.

Prior to this solution, the booster pumps relied on conventional induction motor technology operating with ageing variable speed drives. While mechanically reliable, these systems are inherently less energy efficient than modern synchronous reluctance motor technology, resulting in higher electrical losses, increased operating costs and greater carbon emissions over their service life. The adoption of ABB IE6 SynRM motors and ACQ580 drives represents a significant technological advancement, enabling Southern Water to achieve substantially higher system efficiency while preserving valuable existing pumping assets.

our success

The success of the Mats Hill Booster Pump Energy Saving Upgrade will be measured through a combination of operational, environmental and financial performance indicators. Key measures include reductions in electrical energy consumption, lower operating costs, decreased maintenance requirements, extended asset life and the return on investment achieved through the installation of ABB IE6 SynRM motors, new ACQ580 variable speed drives and hydraulic efficiency improvements. 

By retaining and refurbishing the existing Sulzer pumps rather than replacing the complete pumping system, Southern Water also benefits from avoiding significant capital expenditure while delivering long-term savings through improved system efficiency. These benefits will continue to accumulate over the operational life of the equipment, providing an attractive whole-life cost advantage.

The project was developed specifically to meet Southern Water’s requirement for a practical, cost-effective energy-saving solution that maximised the value of its existing assets. Rather than proposing wholesale replacement of mechanically sound pumps, MKE Engineering Group designed an engineered solution that combined pump refurbishment, hydraulic optimisation and market-leading ABB SynRM technology. This approach met the customer’s objectives of improving efficiency, reducing operational costs and increasing equipment reliability while minimising disruption to service and extending the lifespan of critical infrastructure.

Southern Water selected MKE Engineering Group because of its ability to provide a complete turnkey solution that integrated mechanical refurbishment, electrical installation, project management and commissioning within a single delivery programme. The proposal demonstrated a clear understanding of the customer’s existing assets and operational requirements, recommending the most appropriate technical solution rather than unnecessary equipment replacement. By combining MKE’s engineering expertise with ABB’s high-efficiency SynRM motor technology, the project offered Southern Water a low-risk, technically robust solution capable of delivering measurable energy savings, improved operational performance and long-term value from existing infrastructure.

Testimonial from the Client

The Mats Hill Booster Pump Energy Saving Upgrade has successfully transformed the performance of a critical pumping installation while maximising the value of existing assets. MKE Engineering Group delivered a highly effective solution that combined pump refurbishment, hydraulic optimisation, ABB IE6 SynRM motors, and variable speed drive technology to significantly reduce energy consumption and improve reliability. The project demonstrates how innovative engineering and strong collaboration can deliver substantial operational, financial, and environmental benefits.

We are delighted with the outcome and the long-term value it will provide.

Silviu Carp Technical Energy Engineer Southern Water